Can anyone lend any insight into a slab on grade, pre-engineered metal building design. Local code calls for a flood water depth of 4' above the finish floor elevation which will create considerable floatation uplift. My client wants to flood protect this new building with exterior walls and flood doors as part of the building design such that he can build on his site with no fill dirt required. Any thoughts regarding an economical design? (thick mass concrete floor slab, helical piers, etc?)