Case: The column dowels must be epoxy-coated and extend above the ground level with 1m, then black steel can be used.
The common practice is to make the lap splice between the coated dowels and long. black steel above that limit, which for a reason it's not possible.
Q. Is it possible to coat a steel rebar to a specific length with epoxy and the remaining part kept black ? what about the bond at the section between coated and uncoated parts?
Please I need an quick answer through the specs.
Case: The column dowels must be epoxy-coated and extend above the ground level with 1m, then black steel can be used.
The common practice is to make the lap splice between the coated dowels and long. black steel above that limit, which for a reason it's not possible.