SWfangirl
Electrical
- Aug 25, 2010
- 6
I work on collection system design for wind farms. I am looking for a code reference that supports the use of either bare 7#6 awg or bare 7#8 awg copperweld instead of bare stranded copper for the ground wire in a trench. I have the cost savings already but would like more to present to the owners of the projects.