cancmm
Structural
- Dec 4, 2009
- 93
Is there any guidance on the maximum allowable amount of time that can elapse between consecutive pours in a monolithic structure? The purpose is to see if a cold-joint has formed after a significant delay between concrete trucks. The allotted time would obviously depend on the type of mix, admixtures, weather, etc. but I'm not sure of how to quantify the time in any way.