I'm trying to determine if a masonry foundation wall for a warehouse building that was installed the day that a 2-day cold spell hit, is acceptable or not. I dont' beleive any measures were taken to keep the wall warm (blankets, heaters, etc...) as is stated should be done in the ACI 530 manual.
Is there any way to test the mortar/grout/construction after the fact, if no samples were taken the day of? Should I advise to redo the work?