My company makes and installs free standing aluminum walkway covers and wall attached canopies with front columns. We provide the GC's with a foam block slightly larger than our column (1-1.5"on each side) which they use when the piers are poured. When we are ready to install, we remove the foam and embed our hollow columns 15"-24" with non-shrink grout (min 8000psi) inside and outside the column. Our engineer has always designed this connection as fixed. In a recent project, the EOR (who is responsible for the footing design) is requiring that we design this connection as pinned. I would like to hear feedback on this situation, and if anyone has any reference articles regarding this connection type it would be appreciated if you could share with me.
There is a brief discussion about a similar situation in the thread below:
thread507-127667
However, it does not fully address my question. Also, I was unable to find the article referenced in the thread.
Thanks.
There is a brief discussion about a similar situation in the thread below:
thread507-127667
However, it does not fully address my question. Also, I was unable to find the article referenced in the thread.
Thanks.