jsparre
Structural
- Mar 24, 2003
- 1
I have insufficient intermittent fillet welds, which cannot be reached for improvement. Is it possible to to combine the shear capacity of the existing welding with additional blind rivets for combined load transfer?
Thanks
Joergen
Thanks
Joergen