CSFlanagan
Structural
I'me designing a foundation for a pre-engineered metal building warehouse addition. Because of the existing site topography, the building will sit on reinforced concrete walls that range from 4' to 12' tall. I've designed the walls as cantilvered retaining walls, because after the walls are constructed, the INTERIOR will be filled with #57 stone and a concrete floor slab will be poured. (This is fairly typical of a dock wall for trucks, but these walls are typically only 5 feet tall.)
So the wall starts out as a cantilevered retaining wall, and ends up as a propped basement wall supported at the top of the wall by the floor slab, which is tied into the wall at the top with rebar. The faces of the wall will have stress reversal, meaning the inside of the wall will start in tension as the back-fill stone is filled, then then the exterior face will be in tension once the floor slab (and floor loads) are applied. It's the reverse of your typical basement condition
One thought is that the the wall essentially becomes pre-stressed during the back-filling, and the load reversal is insufficient to overcome these initial stresses.
I've looked through my resources and cannot find a similar example to definitively illustrate how to design for this situation. I was hoping someone ha encountered this situation and can help?
So the wall starts out as a cantilevered retaining wall, and ends up as a propped basement wall supported at the top of the wall by the floor slab, which is tied into the wall at the top with rebar. The faces of the wall will have stress reversal, meaning the inside of the wall will start in tension as the back-fill stone is filled, then then the exterior face will be in tension once the floor slab (and floor loads) are applied. It's the reverse of your typical basement condition
One thought is that the the wall essentially becomes pre-stressed during the back-filling, and the load reversal is insufficient to overcome these initial stresses.
I've looked through my resources and cannot find a similar example to definitively illustrate how to design for this situation. I was hoping someone ha encountered this situation and can help?