calmox
Industrial
- Jan 9, 2017
- 6
Hi Experts.
To those with great knowledge and experienced. I just want to clarify a Build Up Beam Fabrication with join design of Butt Tee joint but full penetration.
My Question is Is there still a required leg size of weld although the process is CJP. Please quote with reference if there is an existing code for this issue
Thank you so much... Cheers.![[pc2] [pc2] [pc2]](/data/assets/smilies/pc2.gif)
To those with great knowledge and experienced. I just want to clarify a Build Up Beam Fabrication with join design of Butt Tee joint but full penetration.
My Question is Is there still a required leg size of weld although the process is CJP. Please quote with reference if there is an existing code for this issue
Thank you so much... Cheers.
![[pc2] [pc2] [pc2]](/data/assets/smilies/pc2.gif)