simplebm
Structural
- Apr 28, 2013
- 24
I have an existing W16X26 spanning 18'-4".with no slab. We want to make it half composite(slab on one side only).
However in order to have the slab at the desired elevation we have to add a 2 1/2" deep HSS filler which will have deck welded to it.
The question is can we weld studs through the deck to the HSS and consider the beam to be half composite?
However in order to have the slab at the desired elevation we have to add a 2 1/2" deep HSS filler which will have deck welded to it.
The question is can we weld studs through the deck to the HSS and consider the beam to be half composite?