Good morning Gentleman,
I have a problem that I would like your support with if possible in order to place a good rationale justification to accept some parts that were oven cure for a longer period of time than what the specification request.
Heres the situation we cured some parts on the oven, and the customer specification request to be cured at 260°F +/-20°F for 60-90 minutes unfortunately the recipe was set up to start the soak time once the lagging Thermocouple reach 250°F instead of the 240°F. so after the lagging TC pass the 240°F the load lasted 105 minutes instead of the maximum 90 minutes per Specification, we tested the test samples and they all came up on good condition they exceeded the customer minimum results required, but unfortunately this doesnt care to them. For my short expericed I know this condition wont hurt the properties of the parts, but they want me to write a good and rationale justification so they can accept those parts. Does any of you could please help me to write a formal and good rationale justification so I can provide to my customer?
Thanks a lot for your support.
I have a problem that I would like your support with if possible in order to place a good rationale justification to accept some parts that were oven cure for a longer period of time than what the specification request.
Heres the situation we cured some parts on the oven, and the customer specification request to be cured at 260°F +/-20°F for 60-90 minutes unfortunately the recipe was set up to start the soak time once the lagging Thermocouple reach 250°F instead of the 240°F. so after the lagging TC pass the 240°F the load lasted 105 minutes instead of the maximum 90 minutes per Specification, we tested the test samples and they all came up on good condition they exceeded the customer minimum results required, but unfortunately this doesnt care to them. For my short expericed I know this condition wont hurt the properties of the parts, but they want me to write a good and rationale justification so they can accept those parts. Does any of you could please help me to write a formal and good rationale justification so I can provide to my customer?
Thanks a lot for your support.