Two recent instances where 3.25 x 3.25 x 6.5-inch grout specimens achieved lower compressive strength at 28-days than at 7-days. Both sets were cast from 3,000-psi CMU block fill provided by a ready-mix plant at the same project. Both sets were cast in those cardboard set-of-4 molds. Both sets were returned to the lab next day, stripped,and "moist" cured for 7 / 28 days. Both sets were capped and tested. Both sets exceeded mix strength at 7-days but only reached about 90% at 28-days. Many other sets at this lab have NOT exhibited this tendency, but what could be the reasons for these two sets peculiar results? Off the top we're ruling out testing technician or equipment error, because great care was taken with the second set due to the results of the first set. Any ideas???