moskey
Civil/Environmental
- Oct 22, 2008
- 6
We are going to be slipforming highway median barrier with electrical junction boxes embedded in the side every 500' or so. The reinforcement and electrical conduit are layed on the ground in front of the slipform machine and are picked up and fed into place by flutes out front (there is no vertical reiforcement).Here's my problem: how do we place the j-boxes in the form with out disrupting the pour? Has anybody else encountered this issue? I have attached a cross-section of the barrier and a j-box. Any input is highly appreciated.Thank you.