mh25
Structural
- Aug 18, 2007
- 3
During the final stages of a concrete slab placement the floor began reacting as a clay and showing signs of plastic shrinkage cracking (some of the cracks were so large you could put your hand in). Temp was 90 with winds under 10mph and humidity was approx 50%. Not conditions where you would normally see a reaction such as this due to rapid drying. The contractor is claiming that this was caused by an overdose of retarder (2% was plant added). I have had trouble gathering information to either substantiate or refute this claim.