Pretty Girl
Structural
- Nov 22, 2022
- 148
I want to know if I did the exposure classification correctly.
Structure Requirements/Detail:
1. Concrete structure with C45/55 Concrete
2. Exposure class XC4
3. Strength class S4: Building structures
3. Need a design working life of 100 yrs
4. It's a member with slab geometry
5. Special quality control of the concrete production ensured.
With the details and requirements considered. I calculated new strength class as follows.
Need a design working life of 100 yrs: Increase class by 2 = +2
Strength class greater than C40/50: reduce by 1 = -1
Member with slab geometry: Yes: reduce by 1 = -1
Special quality control of concrete: Yes: reduce by 1 = -1
New strength class
+2 -1 -1 -1 = -1
So, I reduced class by 1 class. So the new adjusted class = S4-1 = S3
Did I do it correctly?
Structure Requirements/Detail:
1. Concrete structure with C45/55 Concrete
2. Exposure class XC4
3. Strength class S4: Building structures
3. Need a design working life of 100 yrs
4. It's a member with slab geometry
5. Special quality control of the concrete production ensured.

With the details and requirements considered. I calculated new strength class as follows.
Need a design working life of 100 yrs: Increase class by 2 = +2
Strength class greater than C40/50: reduce by 1 = -1
Member with slab geometry: Yes: reduce by 1 = -1
Special quality control of concrete: Yes: reduce by 1 = -1
New strength class
+2 -1 -1 -1 = -1
So, I reduced class by 1 class. So the new adjusted class = S4-1 = S3
Did I do it correctly?