Hello,
I am designing a running track as a volunteer for an elementary school. 1/8 mile oval track with a 12' wide concrete running surface (will be overlay with a poly surface down the line). The section for the track I used is a 4" thick concrete section with rebar. Would calling out construction joints every 5' and then expansion joints every 25' seem reasonable? The school is in Florida so just calling out 4" thick concrete section over compacted sand subgrade.
Any thoughts?
Thanks
I am designing a running track as a volunteer for an elementary school. 1/8 mile oval track with a 12' wide concrete running surface (will be overlay with a poly surface down the line). The section for the track I used is a 4" thick concrete section with rebar. Would calling out construction joints every 5' and then expansion joints every 25' seem reasonable? The school is in Florida so just calling out 4" thick concrete section over compacted sand subgrade.
Any thoughts?