I am designing a reach of large diameter, reinforced concrete storm drain pipe which is quite deep. Pipe ranges from Class IV to Class V. About a 1/4 mile is too deep for Class V and required D-load goes as high as 4,062 (0.01" crack). I am thinking of giving the contractor an option to encase the pipe (Class IV or V) in concrete to provide the necessary extra strength instead of providing the special D-Load pipe. Has anybody done this before and will it reduce the contractor's bid? I would expect the contractor to provide calcs / shop drawings for any proposed encasement.