What construction method can be used to remove the concrete surface from a 3" concrete slab over a 3" composite metal deck? The area will be tapered from 0" to 1 1/2" deep.
Will bush hammering, scarifying and grinding do the trick?
I am not concerned about the finish other than it be level. There will be finish material on it.
Will bush hammering, scarifying and grinding do the trick?
I am not concerned about the finish other than it be level. There will be finish material on it.