sro2ck
Civil/Environmental
- Jan 18, 2014
- 12
In DOE method,
if slump has been specified as 30mm. so, should i take (10-30)mm interval datas
Or
(30-60)mm interval datas for my calculations.
if slump has been specified as 30mm. so, should i take (10-30)mm interval datas
Or
(30-60)mm interval datas for my calculations.