sykimm
Coastal
- Nov 30, 2003
- 35
I've assigned one combined cycle power plant project.
In this project, one question was araised on dischage type in my own.
After seal pit (sypon pit)from condenser, I would like to know, what is the "rule of thume" to select the dischage type, open channel or closed box culvert ?
Might this selection be related with the seawater level condition and site ground level.
Please help me....
In this project, one question was araised on dischage type in my own.
After seal pit (sypon pit)from condenser, I would like to know, what is the "rule of thume" to select the dischage type, open channel or closed box culvert ?
Might this selection be related with the seawater level condition and site ground level.
Please help me....