Hi folks!
Please see attached images.
The 1st floor slab is canterlivering from the groundfloor walls.
Would you say that the 1st floor RC confining element (marked with "?") is necesary, since there is another one at the end of the wall?
Thank you
Please see attached images.
The 1st floor slab is canterlivering from the groundfloor walls.
Would you say that the 1st floor RC confining element (marked with "?") is necesary, since there is another one at the end of the wall?