bjl6457
Mechanical
- Oct 8, 2012
- 2
I am designing a sanitary system in which I am being asked to provide a 2" forced main from a duplex grinder pump and connect it into an existing 4" sanitary line that is gravity-fed. I know that the 2" line will require a check valve per the manufacturer specs, but since this is planned to be all underground; are there any further requirements for the forced-main-to-gravity-connection?
In the past we have pumped a force main up to an overhead sanitary gravity pipe where we dropped into the gravity pipe after the check valve.
Am I right in the thought that a similar system would have to be designed for this; but underground?
Thanks (in advance) everyone!