hamidun
Mechanical
- Jun 3, 2014
- 80
Dear All,
I have seen several installation Power Plant in Indonesia with Total Capacity of 100 MW, they make it 2 x 50 MW.
What is the reason of 2 x 50 MW installed, instead of 1 x 100 MW?
Thank you.
I have seen several installation Power Plant in Indonesia with Total Capacity of 100 MW, they make it 2 x 50 MW.
What is the reason of 2 x 50 MW installed, instead of 1 x 100 MW?
Thank you.