Longhorn2
Geotechnical
- Jan 28, 2003
- 5
How much will an embankment of clay fill (CH and CL mix) compacted to between 92% and 95% rel. compaction based on the max. dry unit weight of the ASTM D 698 method settle (consolidate) under its own weight? (in terms of a percentage of embankment height). Ignore foundation soil. Looking for long term total settlement (under centerline of wide embankment). Moisture content at time of compaction is say between optimum and +2%.
In the stormwater management pond industry I have seen requirements of 5% camber but I would like some better feedback.
Thanks!
In the stormwater management pond industry I have seen requirements of 5% camber but I would like some better feedback.
Thanks!