mbsmith
Civil/Environmental
- Feb 6, 2002
- 7
Without doing detailed design, I need to estimate construction costs to renovate an existing warehouse area by converting it into office space, including a ground floor and a new second floor to be added. Any rules of thumb for this, including heat, air, insulation, electrical, structural, sprinklers, etc.?