Contractor is requesting to put construction joint on a slab on grade with grade beams. The c.j. will be located about 6" below top of beam (this is the thickness of slab). They want to pour grade beam 1st upto the slab bottom, then 2nd pour the entire slab including the top portion of grade beam.
Say they follow proper c.j. preparation (roughing and wetting). Will this be ok?
Say they follow proper c.j. preparation (roughing and wetting). Will this be ok?