braves25
Structural
- Jan 2, 2004
- 64
I am desinging a two-way slab and wanted some input on location of construction joints and crack control. The ACI 301 calls for construction joints to be placed in the middle third of the span and perpendicular to the main reinforcement. In a two-way slab the "main" reinforcement is running in both directions. Do I need any sawcut control joints as well? The owner is very particular about cracks in his slab. Thanks for your help in advance.