I've designed a 3.50m high reinforced earth accoustic bund, it's got 45 degree slopes and a 1m wide strip along the top. The contractors on site are wondering how to place and compact the soil now it's about 2m high. For H&S reasons they are reluctant to ave any plant running along it (one false move and it would be rolling down the side). There are also concerns about personnel being on top of it. This will obviously become more onerous the high (and narrower) it becomes.
Has anyone got any practical experience of constructing these things? I know they are commonly built, I've seen many of them that have been finished. The contractor has never built one before and needs some advice.
Thanks