GalileoG
Structural
- Feb 17, 2007
- 467
I have a few OWSJ that are supporting existing roof top units. These roof top units will be removed and replaced with heavier units and so the OWSJ require reinforcing. What is the required sequence of construction here? The joists are to be shored during reinforcing work but can the existing units remain while the reinforcing work is conducted? I have designed the reinforcing to resist the difference of load between the original design load and the new design load, not for the total load acting on the joists. Your suggestions would be appreciated.