Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations The Obturator on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Control joints

Status
Not open for further replies.

72shortbox

Geotechnical
Nov 12, 2001
44
I have seen 2 ways of installing control joints in a slab
1) pour, finish, let setup and cut the joints with a saw
2) pour, and as they are finishing the surface they cut in a grove with a trowel

Does it make any difference
 
Replies continue below

Recommended for you

Generally, saws are used for larger areas. Control joints for small areas, such as sidewalks, are usually tooled in with a "grooving tool".

PCA recommends that the depth of the joint be at least 1/4 of the slab thickness.

The sawcuts give a square edge that can be "supported" by sealant (to prevent breaking off the edge from hard wheel traffic). The grooving tool gives a rounded edge that cannot be "supported" by sealant.

Many contractors and engineers prefer the early entry saws like "Soff Cut". This avoids the problems with cracking occuring before the slab is cut.

I hope this helps!
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor