72shortbox
Geotechnical
- Nov 12, 2001
- 44
I have seen 2 ways of installing control joints in a slab
1) pour, finish, let setup and cut the joints with a saw
2) pour, and as they are finishing the surface they cut in a grove with a trowel
Does it make any difference
1) pour, finish, let setup and cut the joints with a saw
2) pour, and as they are finishing the surface they cut in a grove with a trowel
Does it make any difference