84malibu,
You should pay some attention to the particular choices of turbines, generators, and condensers that may be used and how many stages of feedwater heating that your cycle will use. Will there be some process use for any extracted steam? Condenser cooling conditions, including seasonal variations, must be properly considered in your analysis. These will all have significant implications for the cycle efficiency and gross turbine power available. Net power available will be substanitally less than gross power since at this level of steam temperature, pressure, and flow, the auxiliary power requirements (fans, pumps, compressors, exhaust gas cleaning equipment, etc.) will be proportionately quite significant. Without knowing anything about your system but what you have stated, I would expect to find that the auxiliary power needs will probably significantly exceed 10% of the gross turbine-generator output.