I have a consultant that is requiring a dry system for an MRI room. Typically, we do wet pipe CPVC or Copper in MRI rooms. However, since this is a dry system, CPVC is out. Is there anything prohibiting Copper tubing in a dry system? Would I still use a C-150 for the calcs if it is permissible?
Thanks in advance for any help.