AeroJDK

Aerospace
May 5, 2005
16
I'm trying to copy multiple sketches that exist on one plane to another plane. It seems that I have to do this one sketch at a time...is there a faster way? Thanks in advance...

Jon
 
Replies continue below

Recommended for you

you could just select the sketches in your tree and convert all the sketch entities to the new plane.

Best Regards,
Jon

Challenges are what makes life interesting; overcoming them is what makes life meaningful.

Solidworks 2005 SP3.0
 
Thanks for the help, but I need to make a copy of the sketch...for lofting purposes. Is there a way to copy all of them in one swoop?

On the "new plane" note: I have selected multiple planes before and performed that function, but it only seems to do it on the first plane...any thoughts?

Jon
 
or... ctrl/select the sketch in feature manager tree and drag it to the surface you want the new sketch.

Chris
Sr. Mechanical Designer, CAD
SolidWorks 05 SP2.0 / PDMWorks 05
ctopher's home site
FAQ371-376
FAQ559-1100
FAQ559-1091
FAQ559-716
"DON'T BE IRREPLACEABLE. IF YOU CAN'T BE REPLACED, YOU CAN'T BE PROMOTED"
 
I am trying the suggestions, but it still only copies one sketch. I am selecting multiple (which exist on one plane), selection "Copy", selecting the new plane, and selecting "Paste". This only copies one sketch...