bladeyus
Civil/Environmental
- May 10, 2013
- 6
I am trying to design a special concrete shear wall. The boundary zones of the wall needs to be approximately %60 of the total wall length so there is not much space left for panel zones. In NEHRP document it mentiones that the wall can be composed of pre-tied modules that can be connected prior to closing of formworks. (see attached image)
Could you please tell me what kind of details are used to connect those pre-tied modules to each other afterwards (especially for horizontal reinforcement & stirrups)?
Could you please tell me what kind of details are used to connect those pre-tied modules to each other afterwards (especially for horizontal reinforcement & stirrups)?