briand2
Mechanical
- Jan 15, 2002
- 180
I am responsible for several cooling tower water systems. Our standard procedures, etc require us to chlorinate the systems every six months. We used to get the measured Free Chlorine to 25 mg/l (equivalent to 25 ppm) and circulate for two hours. Recently, some of our colleagues have instead been maintaining 50 mg/l for 1 hour. The disinfection is more or less the same (twice as much free Chlorine, for half the time), but which is preferable with regard to minimising system corrosion? The systems typically contain stainless steel cooling towers, steel pipework and copper heat exchangers. Note; in both cases, we first add inhibited Hydrochloric Acid to bring the pH down to about 6.5, then add the Sodium Hypochlorite solution.
Thanks,
Brian
Thanks,
Brian