I have been asked to design a detention pond for the 100 year_ 5 day storm event by the local governing body. Typically the 100 year_24 hour storm is used as the design criteria. I am wondering why this would be requested. It seems to me that the rainfall intensity would be less and thereby allowing for greater infiltration, a smaller peak runoff and thereby requiring a smaller storage volume. Is there a logical and/or technical reason for this request that I am just missing?