Gentlemen
We have a case of an 8 feet deep reinforced slab on grade that is going to carry train rails.
The structural drawings specify a maximum pour length of 25 ft in order to have a construction joint every 25 ft for the crack control.
Is ther's any way to run away with a pour length of 100 ft (contraction joint location) as one pour.
Please help