EireChch
Geotechnical
- Jul 25, 2012
- 1,342
I am reviewing a design report and came across the statement below. I am not sure what to make of it.
The development comprises a 6m deep basement, 450 and 600mm dia contig pile wall. Ground conditions comprise 2.5m of gravel then Clay. It is over consolidated clay so due to the stress relief there will be heave. The internal columns, walls are supported on pile caps.
As the bearing piles are in a basement, there will be a degree of basement heave. Hence, there will be a degree of pile cracking, which usually closes up as the building load is applied
How will the pile crack? due to the shaft friction and vertical heave causing a horizontal type crack? Is it acceptable to say it will crack and then close up. Can the reinforcement not be spec'd to minimise the crack width? Interested to hear peoples thoughts.
Cheers
The development comprises a 6m deep basement, 450 and 600mm dia contig pile wall. Ground conditions comprise 2.5m of gravel then Clay. It is over consolidated clay so due to the stress relief there will be heave. The internal columns, walls are supported on pile caps.
As the bearing piles are in a basement, there will be a degree of basement heave. Hence, there will be a degree of pile cracking, which usually closes up as the building load is applied
How will the pile crack? due to the shaft friction and vertical heave causing a horizontal type crack? Is it acceptable to say it will crack and then close up. Can the reinforcement not be spec'd to minimise the crack width? Interested to hear peoples thoughts.
Cheers