ivanga7
Civil/Environmental
- May 20, 2016
- 40
Hi, I'm designing the footings for a metal building (designed by others) that will house a 50 ton crane. The metal building designer has provided me with the reactions at each frame. One of those reactions is the crane load which accounts for the crane moving. I am having a difficult time figuring out how to incorporate that load into my load combinations. Should I just treat it as a live load?