I have question regarding CRN and pressure vessel burst test as per ASME.VIII-1 UG-101(m).
I have vessel which contain a Welded Stayed Constuction as per UW-19. UW-19(c)(2) stated that the MAWP need to established in accordance with UG-101 on a representative panel.
I did this test, does it enough or should I test a complete vessel?
I have vessel which contain a Welded Stayed Constuction as per UW-19. UW-19(c)(2) stated that the MAWP need to established in accordance with UG-101 on a representative panel.
I did this test, does it enough or should I test a complete vessel?