Is there any regulation regarding the liquid that can be maintained in a cross country pipeline. What is specifically required to be known is - Is it correct to leave an underground/above ground pipeline with a line content of gasoline after operations. If not what is the pipeline kpt with during the time it is not being operated.Could someone help me out on this