Yihan
Structural
- Oct 13, 2011
- 15
the compaction surcharge specified in 6.9.3 CSA S6-06 (linearly varying from 12Kpa at top to 0Kpa at 1.7m or 2.0m).
is this a live load or dead load? thanks
is this a live load or dead load? thanks
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.