lately on plant we faced aproblem with the secondary of one CT and one VT. CT was used for protection 8000/1 5P20 toroid, VT (or PT for US) was used for exciation control 15750/V3 / 120 V Cl.0.2s.
In order to put the unit back in service i put in parallel the secoindar of the PT of another phase , same class, to have the voltage measurements.
Also for the current i put the secondary winding of another phase in series in order to have the same current.
This worked but i dont know if i should keep it this way or change the failed CT and PT with new ones.
In order to put the unit back in service i put in parallel the secoindar of the PT of another phase , same class, to have the voltage measurements.
Also for the current i put the secondary winding of another phase in series in order to have the same current.
This worked but i dont know if i should keep it this way or change the failed CT and PT with new ones.