Nick Rose
Agricultural
- May 14, 2017
- 1
We just had a new driveway and pathway poured on 5/9 and yesterday 5/13 the contractor told us to water down the the concrete 3 times a day for a week. The concrete mixture is for 4000 PSI. Are we wasting our time watering 3 times a day? Everything that I read is that you have to keep it wet 24/7 for at least a week and to never let it dry out. When we do wet it you can see that the concrete quickly absorbs it.