briandestefano
Civil/Environmental
- Apr 7, 2008
- 23
I will be preparing a stormwater management report for an industrial site (new construction) with a large gravel area. The area will be approximately 5 acres with a 12" depth. I was wondering what curve number you guys think would be best to use. I have worked on other projects before where I was instructed to use 98, the same as asphalt paving, and other times it has been lower.
Being that so much of the site will be covered with asphalt and buildings I would like to use a lower curve number, that is still accurate, for the gravel storage and parking areas. Any help you guys can give is much appreciated
Being that so much of the site will be covered with asphalt and buildings I would like to use a lower curve number, that is still accurate, for the gravel storage and parking areas. Any help you guys can give is much appreciated