mrengineer
Structural
- Feb 11, 2002
- 157
This is a survey - Do you normally cut a percentage of the horizontal bars at vertical construction joints in c.i.p. walls, when the walls span between deep foundations? (Situation I am looking at has long exposed walls in underground parking area).