DuckEngineer
Civil/Environmental
I have been asked to get up to speed on dam breach analysis for permitting. Most of the work is low hazard, relatively short (under 10' high) dams. I don't have any real background in HMS or RAS. My general understanding is that HMS provides the hydrology and hydrographs, while RAS provides the analysis of structures and elevations. The question is whether the dam breach analysis that can be done in HMS is on a par with what can be done in RAS? I have a choice between HMS training and RAS training and this is the likely tie-breaker. Thanks, all.