bookowski
Structural
- Aug 29, 2010
- 983
When using software (Risa, Etabs etc) to implement DAM the software is reducing member stiffness, two problems I have:
- this likely results in a longer period calculation and therefore not conservative for eq loads
- in my area/type of work it's almost always wind drift under service level wind that controls, the reduced stiffness is overestimating service drifts
Two models? Or one model first with no dam to get periods and establish a system that works for drift and then turn on dam for design.... and then remember every time you fiddle with the model to know if dam is off or on?
- this likely results in a longer period calculation and therefore not conservative for eq loads
- in my area/type of work it's almost always wind drift under service level wind that controls, the reduced stiffness is overestimating service drifts
Two models? Or one model first with no dam to get periods and establish a system that works for drift and then turn on dam for design.... and then remember every time you fiddle with the model to know if dam is off or on?