DoogieP
Mechanical
- Apr 1, 2013
- 22
Greetings All,
I hope someone can clarify an ongoing debate on interpretaion of a print.The attached print is a basic representation of an actual part and shows the features in question. As I see the part the datum reference frame is established by A, P3 and P4 since hole P1 has no positional tolerance and notes on the drawings indicate as such. The debate is on the .019 profile of a surface to datum C and how it is referenced to the .002 profile callout and the 5.250 +/-.005. Our Process engineer who also controls our OGP SmartScope says that you cannot have a profile of .019 on datum c because it violates the +/-.005 tolerance. I don't see it this way, the print specifies "dimensioning and tolerancing IAW asme y14.5m-1994. I said it is possible because the 5.250 will move with any deviation of this surface and the 5.250 is a secondary control of form. Our second debate is, he is establishing datum C from the part itself but, I see datum C as being "implied" and should be established using basic dimensions to create theoretical plane because it is there to establish location of the tolerance zone. pleas chime in, any and all feedback is greatly appreciated.
Thanks In Advance,
Doug
I hope someone can clarify an ongoing debate on interpretaion of a print.The attached print is a basic representation of an actual part and shows the features in question. As I see the part the datum reference frame is established by A, P3 and P4 since hole P1 has no positional tolerance and notes on the drawings indicate as such. The debate is on the .019 profile of a surface to datum C and how it is referenced to the .002 profile callout and the 5.250 +/-.005. Our Process engineer who also controls our OGP SmartScope says that you cannot have a profile of .019 on datum c because it violates the +/-.005 tolerance. I don't see it this way, the print specifies "dimensioning and tolerancing IAW asme y14.5m-1994. I said it is possible because the 5.250 will move with any deviation of this surface and the 5.250 is a secondary control of form. Our second debate is, he is establishing datum C from the part itself but, I see datum C as being "implied" and should be established using basic dimensions to create theoretical plane because it is there to establish location of the tolerance zone. pleas chime in, any and all feedback is greatly appreciated.
Thanks In Advance,
Doug