tbh64
Geotechnical
- Jul 22, 2010
- 2
I am doing a deep excavation stability analysis using GSTABL. The excavation is about 75 feet high and is mainly in clay with drianed friction angle 16 degree.
The bottom of the excavation will have a mat about 4 feet thick. I have developed a GSTABL model using a 4 feet mat and have given a concrte shear strength with phi = 50 degree. I have developed another GSTABL model where I have not incorporated mat as an "imaginary soil" layer. My first model with mat as an "imaginary soil layer" gives me a factor of safety (FS) about 1.0 but my second model without mat give me FS=0.80. I have the following questions:
1) which model is more appropriate, with mat as an soil layer or no mat layer just the weight of the mat?
2) if I use mat, is there any concern about the uplift of the mat due to slideing of the retained mass behind the excavation?
3) in order to achieve a FS=1.3 I am using deep drilled pier as stabilizing elements, based on the diffenrt modeling techniques forces are very different and I am not sure which one I should choos to design the piers. Any though or help will be very appreciated. Thanks in advance for any positive feedback. Regards,
The bottom of the excavation will have a mat about 4 feet thick. I have developed a GSTABL model using a 4 feet mat and have given a concrte shear strength with phi = 50 degree. I have developed another GSTABL model where I have not incorporated mat as an "imaginary soil" layer. My first model with mat as an "imaginary soil layer" gives me a factor of safety (FS) about 1.0 but my second model without mat give me FS=0.80. I have the following questions:
1) which model is more appropriate, with mat as an soil layer or no mat layer just the weight of the mat?
2) if I use mat, is there any concern about the uplift of the mat due to slideing of the retained mass behind the excavation?
3) in order to achieve a FS=1.3 I am using deep drilled pier as stabilizing elements, based on the diffenrt modeling techniques forces are very different and I am not sure which one I should choos to design the piers. Any though or help will be very appreciated. Thanks in advance for any positive feedback. Regards,